40 Horne st, Sunbury

April 2019

The property was previously underpinned and and overpinning was required to tie in this fragile corner. The building was over 100 years old and the brick bond was English bond, the bond had become detached with a cavity starting to form where the bond was becoming detached, the external corner was bowed, especially where the stone lintol ran all the way through to the existing face brickwork, 6mm HeliTie Bar was installed every 4 courses all the the way from the ground level and beyond the first floor joists and HeliTies installed where necessary.